How to set one-way signals & tracks in the largest custom house (5-track siding).
Other W&R Guides:- Gameplay Tips & Tricks.
- Resource Flow Chart.
Aerial View
The first setting, making rides are collision-free. I use two tunnels. The number of trains in the queue is almost unlimited!
General view:
Zooming in to the station:
Second setting, without tunnels, but with crossover. The number of trains at the same time can not exceed six, possibly seven.
Green arrow show the access tracks:
Red indicate the return path:
All of the trains visible below (near loading points) reach the border station, they unload and leave without being blocked and jammed.
Source: https://gameplay.tips/guides/4052-workers-and-resources-soviet-republic.html
More Workers and Resources Soviet Republic guilds
- All Guilds
- Workers & Resources: Soviet Republic - Beginners Guide
- Workers & Resources: Soviet Republic - Gameplay Tips & Tricks
- Workers & Resources: Soviet Republic - Resource Flow Chart